SEAPA Hydro Power
contact SEAPA
 
 

Tyee Lake Intake Gate Hydraulic Power Unit (HPU) Relocation & Intake Gate Refurbishing Project

Project Updated: 2020-07-21 20:54:24
Status: Open: 2020-07-22 08:00:00  |  Closes: 2020-08-10 16:00:00

 

Description

The Southeast Alaska Power Agency (SEAPA) is soliciting proposals from qualified contractors for the removal, repair, installation, and commissioning of SEAPA's Tyee Lake Hydroelectric Project Intake Gate and related Hydraulic Power Unit (HPU).  The project will consist of two phases: Phase 1 (relocate HPU skid from within the gate shaft to an above-ground location) and Phase 2 (refurbish intake gate and replace hydraulic cylinders interconnecting gate stems).  The Tyee Lake Hydroelectric Project is located 40 miles SE of Wrangell, Alaska at the head of the Bradfield Canal.  Proposals are due August 10, 2020 at 4:00 p.m. AKDT.

You must Register or Login to view links

Request for Proposals for Tyee HPU Relocation & Intake Gate Refurbishing Project
Appendix A to RFP - Tyee Aircraft and Runway Standards Operating Procedure (SOP)
Appendix B to RFP - Eight (8) Reference Drawings
Appendix C to RFP - Project Design Drawings
Appendix D to RFP - Documents Re Owner Supplied Materials
Appendix E to RFP - Coal Tar Specification Sheets
Appendix F to RFP - Operation & Maintenance Descriptions for Equipment
Appendix G to RFP - Safety
Attachment Nos. 1 thru 11 to RFP

Contact:

Sharon Thompson
Contracts Administrator
sthompson@seapahydro.org
9072282281