Call us: 907.228.2281
email: info@seapahydro.org

SEAPA Hydro Power
contact SEAPA
 
 

Swan Lake Station Service Switchgear Design-Build Project

Project Updated: 2019-01-24 20:36:27
Status: Open: 2019-01-25 08:00:00  |  Closes: 2019-03-11 16:00:00

 

Description

The Southeast Alaska Power Agency (SEAPA or Agency) is seeking proposals from qualified industrial electric installation contractors to design, procure, install, and commission new 480V double-ended, metal-clad switchgear, transformers, panelboards, ancillary equipment and cables from new equipment to the first point of termination for the Agency's Swan Lake Station Service Distribution System.  The completion date for Phase 1 (Design/Procurement) of the project shall be on or before September 30, 2019 and the completion date for Phase II (Construction) shall be on or before July 31, 2020.  The Swan Lake Hydroelectric Project is located approximately 22 air miles or 31 water miles northeast of Ketchikan, Alaska on Revillagigedo Island.  Proposals are due by March 11, 2019 at 4:00 p.m. AKDT.  

You must Register or Login to view links

Request for Proposals
Attachment Nos. 1 through 11 to RFP
Appendix A - Technical Specifications
Appendix B - Drawings (Part 1 of 4)
Appendix B - Drawings (Part 2 of 4)
Appendix B - drawings (Part 3 of 4)
Appendix B - Drawings (Part 4 of 4)
Appendix C - Submittal Registry

Contact:

Sharon Thompson
Contracts Administrator
sthompson@seapahydro.org
9072282281